2019-2020 | Arena Renovation
Concept design, diagrams, drawings, on-site verification & visits, client & consultant coordination, visioning sessions
Levi's Stadium is located in Santa Clara, CA and home to the San Francisco 49ers NFL team. The $1.2 billion Levi’s Stadium, designed by HNTB, is one of the most innovative and technologically advanced stadiums in the NFL today. Delivered on budget and on schedule, the home of the San Francisco 49ers is the first new-construction NFL stadium to achieve LEED® Gold certification.
To achieve the premium design and express the franchise’s distinctive character, the project team formed a “creative council,” which informed the design of premium spaces and resulted in each club feeling like the sponsor’s brand.
The stadium was delivered under a first-of-its-kind hybrid design-build model, which thrives on intense owner-project team collaboration. The heightened collaboration accelerated an aggressive schedule. Construction started in April 2012, and Levi’s Stadium opened July 17, 2014, becoming the NFL’s fastest-constructed stadium.
**Work done with HNTB
Photos: jimsimmonsphotography.com
Sacramento Republic FC Stadium
**Work done with HNTB
Sacramento Republic FC Stadium Animation
https://www.mls2sac.com/
2018-2020 | Improvements Project
Concept, Schematic Design, Design Development, renderings, diagrams, on-site verification, client & consultant coordination
2019-2020 | Mackay Stadium
Reno, Nevada
ADA upgrades: West premium seating & ADA, East Suite renovation & premium seating, North / South Bowl modification (aluminum bleachers); SD-CA phases, BIM documentation all phases, presentation, diagrams, ADA & seat calculations, on-site verification, RFI / shop drawing review, specifications, door hardware and railing detailing, site line studies/calcs, consultant coordination
**Work done with HOK
2019-2020 | Clubhouse Renovation
Concept, Schematic Design, renderings, diagrams, on-site verification, client & consultant coordination
**Work done with HOK
2019-2020 | UC Berkeley College of Chemistry Addition
(formerly Avaya Stadium)
Area Studies/Projects - Premium seating, multiple clubs, Player bridge, Supporters Section, North Bowl & Club: Concept, consultant coordination, drawings, 3d modeling, renderings, diagrams, presentations
**Work done with HOK
2018-2019 | Clark Kerr Beach Volleyball Complex
Site planning, other event planning, Schematic Design, Design Development, diagrams, on-site verification, client & consultant coordination
**Work done with HOK
2020 | Oakland Root Stadium Feasibility Study
Site planning & analysis, masterplan development
**Work done with HOK
2020 | UC Berkeley College of Chemistry Addition
Feasibility Study
Site planning, charrette, Consultant coordination, BIM modeling, drawings, diagrams, visualization
**Work done with HOK
2019-2020 | Vitalant (Brisbane,CA)
Construction Documentation, Construction Adminstration, diagrams, on-site verification, client/developer & consultant coordination, BIM support
**Work done with HOK
**Work done with HNTB
Matt's involvement included the initial winning design proposal, planning, concept, schematic design, design development, and construction documents.
Locker Room Reveal : August 25, 2016 :
Construction Webcam : http://webcam.oregonstate.edu/reser/
Renderings by Lightbox
Project done with DRDS
DONGZHOU FLUVIAL CITY MASTER PLAN
Fuyang City, People’s Republic of China
The project is a conceptual master plan for 6.86 sq miles of a portion of Dongzhou Island in Fuyang City located west of the West Lake Hangzhou District. Situated at the confluence of the Beizhi and Fuchan Rivers, it acts as a catalyst for future development of the region.
The project represents the development of a new urban core for the City of Fuyang. The intent is to provide a vibrant lifestyle community for both residents and tourists to enjoy sports and leisure in a beautiful and natural setting. There is careful consideration and control of land uses locations and densities to foster synergistic relationships that create valuable program elements for both residence and visitors. The program includes condominiums, private residence, sports + leisure venues and activities (indoor and outdoor), retail, entertainment and hospitality, civic amenities and tourist destinations.
-
Project done with Ilaria Mazzoleni Studio
"Warm It Up", a project designed by IM Studio, opened in Milan at the Triennale Design Museum. Matt was part of the design collaboration team. There are images of the work here:
Project done with Karlsberger
Project Details:
-2006-2007
-Opened in 2009
Located in Louisville, KY
-New 300,000 SF replacement hospital, 4-story, 119 bed
-$155 million Hospital designed by Karlsberger and built by Gilbane Construction
-Hospital features include private rooms, an ICU, medical/surgical and ICU beds, special-care nursery units, general radiology facilities, gift shop, pharmacy, and chapel
-Generated exterior color renderings, schematic design through construction documents
Software used: Revit Architecture
Work done with Karlsberger
Worked on construction documents, design of patient rooms & mockups, and construction administration phase (RFIs & submittals)
-New Hospital (A Pebble Project) opened in 2007
-325,000 SF Labor and Delivery focused facility and M.O.B.
-94 bed acute care hospital is expandable to 300 rooms
-$150 million hospital was designed by Karlsberger and built by Elford/Gilbane Building Company
Completed Work Photos by Brad Feinknopf: http://www.feinknopf.com/
Video - Health technology : https://www.youtube.com/watch?v=KSiAB8ZP1Ag
2021-Present | Foot Soldiers Park
Coming soon, stay tuned!
Site analysis, presentation, programming, 3d modeling, research and development for metaverse / NFT
Serving on design team and art advisory board